技术服务TECHNICAL SERVICE

Oilfield Development Technique
Your current location:Technical > Oilfield Development Technique

 

      Effective drilling-fluid removal is a prerequisite for primary cementing success. Mud left in the wellbore prevents effective isolation. This can result in stimulation out of zone, production of unwanted fluids, loss of hydrocarbons to low-pressure zones, sustained casing pressure, underground blowouts, or casing corrosion.

Increase cementing success

Improve flow around the annulus

Remove mud completely

Ensure proper zonal isolation


【RETURN】
  • ABOUT US
  • TECHNICAL
  • NEWS
  • INVESOTR
  • RECRUITMENT
  • CONTACT US
Scan code attention

Copyright(c)2016 北京恩瑞达科技股份有限公司 版权所有 京ICP备08101509号 Beijing Public Security No. 11010802017916 Powered by insaas.com

版权为北京恩瑞达科技股份有限公司所有,未经许可不得转载或链接